Please note the library is open to the public. Readers wishing to consult the following works are asked to contact the librarian on 0191 233 2459 or at librarian@mininginstitute.org.uk to check availability.
622.81 HAR
Bingham, T.R.
Incendive sparking associated with shearer machines
SR Shelf 89. 622.232.46(427.4) LON*
Longworth, R.
The development and operational practice of the Eickhoff EDW 170 LN in web shearer by the Barnsley area of the National
Coal Board [Manuscript]
1978
Summary: Poole Prize paper - 1978.
Poole Prize paper - 1978.
622.232.431(942) NAT
National Coal Board
Trepan shearer at Bolden(sic) colliery [Motion Picture]
622.001:622.232 Cabin*
Dalziel, J. A.
The performance of a quarter scale model disc shearer cutting into Teversal Dunsil coal /
Isleworth : Mining Research Establishment, 1968
Summary: At head of title: National Coal Board. Production Department.
Includes bibliographical references (p. 9-10).
622.001:622.232 Cabin*
Foote, P.
The effect of increasing width of web cut by a laboratory model shearer drum /
Isleworth : Mining Research Establishment, 1965
Summary: At head of title: National Coal Board. Production Department.
1965 research programme ref. no. 34.
Spiral bound.
622.001:622.232 Cabin*
Ganguli, A.
Examination of various point-attack picks from Anderton shearer loader /
Isleworth : Mining Research Establishment, 1965
Summary: At head of title: National Coal Board. Production Department.
1965/6 research programme ref. no. 61.
Spiral bound.
Includes bibliographical references (p. 9).
622.861 UNI
United Kingdom. Health and Safety Executive.
Mechanical Circular No. (81)66: Basic Requirements for the Design and Construction of HSV/Wet Cutting Equipment for
Shearer Loaders. [Microfilm]
London : United Kingdom. Health and Safety Executive, 1981
Summary: Cabinet 2 Drawer 1 Roll 2
622.861 UNI
United Kingdom. Health and Safety Executive.
Mechanical Circular No. (82)23: Basic Requirements for the Design and Construction of HSV/Wet Cutting Equipment for
Shearer Loaders. [Microfilm]
London : United Kingdom. Health and Safety Executive, 1982
Summary: Cabinet 2 Drawer 1 Roll 2
622.861 UNI
United Kingdom. Health and Safety Executive.
Mechanical Circular No. (82)65: Use of Fire Resistant Fluids in Shearer Loaders. [Microfilm]
London : United Kingdom. Health and Safety Executive, 1982
Summary: Cabinet 2 Drawer 1 Roll 2
622.861 UNI
United Kingdom. Health and Safety Executive.
Mechanical Circular No. (86)39: Reliability of Shearer Gearheads - Duty Rating. [Microfilm]
London : United Kingdom. Health and Safety Executive, 1986
Summary: Cabinet 2 Drawer 1 Roll 5
622.861 UNI
United Kingdom. Health and Safety Executive.
Mechanical Circular No. (86)45: Design Considerations for Heavy Duty Shearer Underframes. [Microfilm]
London : United Kingdom. Health and Safety Executive, 1986
Summary: Cabinet 2 Drawer 1 Roll 5
622.861 UNI
United Kingdom. Health and Safety Executive.
Mechanical Circular No. (87)7:The AM420 Buttock Shearer. [Microfilm]
London : United Kingdom. Health and Safety Executive, 1987
Summary: Cabinet 2 Drawer 1 Roll 5
622.861 UNI
United Kingdom. Health and Safety Executive.
Mechanical Circular No. (87)65: Incident Involving an AB 16 Shearer. [Microfilm]
London : United Kingdom. Health and Safety Executive, 1987
Summary: Cabinet 2 Drawer 1 Roll 6
622.861 UNI
United Kingdom. Health and Safety Executive.
Mechanical Circular No. (90)29: Shearer Transporter. [Microfilm]
London : United Kingdom. Health and Safety Executive, 1990
Summary: Cabinet 2 Drawer 1 Roll 7
622.861 UNI
United Kingdom. Health and Safety Executive.
Mechanical Circular No. (91)48: BJD ACE Shearer. [Microfilm]
London : United Kingdom. Health and Safety Executive, 1991
Summary: Cabinet 2 Drawer 1 Roll 8
622.861 UNI
United Kingdom. Health and Safety Executive.
Mechanical Circular No. (92)3:ORE Reports:- 1. AM500 Performance and Reliability: Update. 2. Maintenance Policies for
the AM500 Longwall Shearer. [Microfilm]
London : United Kingdom. Health and Safety Executive, 1992
Summary: Cabinet 2 Drawer 1 Roll 8
622.861 UNI
United Kingdom. Health and Safety Executive.
Electrical Circular No. (91)59:ACE Shearer Immobilisation [Microfilm]
London : United Kingdom. Health and Safety Executive, 1991
Summary: Cabinet 2 Drawer1 Roll 3
622.861 UNI
United Kingdom. Health and Safety Executive.
Electrical Circular No. (86)26: Surface Trials of the BJD `ACE' Shearer [Microfilm]
London : United Kingdom. Health and Safety Executive, 1986
Summary: Cabinet 2 Drawer1 Roll 8
622.82
Bingham, T. R.
Incendive sparking associated with shearer machines
Illawarra : The Australasian Institute Of Mining And Metallurgy, 1981
622(41)
Institution of Mining Engineers
Anderton Shearer Loader,the
London : Institution of Mining Engineers, 1954
622(41)
Institution of Mining Engineers
The Anderton Shearer Loader
London : Institution of Mining Engineers, 1954
622.001:622.232 MIN
Mining Research Establishment
Examination of Austin Hoy Lockfast Shearer Picks.
Isleworth : National Coal Board Production Department, 1963
622.001:622.232 MIN
Mining Research Establishment
Examination of 'FV' Shearer Pick ex Manufacturer 'GG'.
Isleworth : National Coal Board Production Department, 1962
622.001:622.232 MIN
Mining Research Establishment
Examination of Various Samples of 'FV' Type of Anderton Shearer Picks ex Manufacturer 'Y'.A.
Isleworth : National Coal Board Production Department, 1961
622.001:622.232 MIN
Mining Research Establishment
The Performance of a Small Scale Shearer Drum using Picks with different Degrees of Side Rake
Isleworth : National Coal Board Production Department, 1969
622.001:622.232 MIN
Mining Research Establishment
The Effect of Line Spacing and Pick Shape on the Performance of a Small Scale Shearer Drum
Isleworth : National Coal Board Production Department, 1969
622.001:622.232 MIN
Mining Research Establishment
Coal face trials of N.C.B. large shearer picks fitted with detachable ends.
Isleworth : National Coal Board Production Department, 1968
622.001:622.232 MIN
Mining Research Establishment
Preliminary ventilation studies to reduce the explosion hazard around a shearer power loader.
Isleworth : National Coal Board Production Department, 1968
622.001:622.232 MIN
Mining Research Establishment
Studies of the effect on methane and respirable dust concentrations when using a ventilated shearer drum.
Isleworth : National Coal Board Production Department, 1967
622.001:622.232 MIN
Mining Research Establishment
Theoretical and model methods of assessing vertical steering systems for shearer loaders.
Isleworth : National Coal Board Production Department, 1968
622.001:622.232 MIN
Mining Research Establishment
The performance of a quarter scale model disc shearer cutting in Teversal Dunsil coal
Isleworth : National Coal Board Production Department, 1968
622.001:622.232 MIN
Mining Research Establishment
The M.R.E. large pick shearer drum.
Isleworth : National Coal Board Production Department, 1964