NEIMME: Library

Jarrow Staithes

Materials kindly donated from the collection of Mr. J. Cockburn of Messrs. Turnbull & Co.

Plans (approx. A0) of the Coal Shipping Plant (Staithes) at Jarrow, built for the Tyne Improvement Commission, 1935.

Location: Strongroom Centre tables

Electrical Distribution House

Internal stations for Drive House

Internal structure of Drive House

Gallery between 1 and 2 houses

Main girders for gallery

Single conveyor between 2 and 3 houses

Girdirs MG11 to MG15

Main gallery between Electrical Distribution House and No. 1 house

Stringers and Floor beams for Blackett Street Bridge

Main girders for Blackett Street Bridge

Angle ties for Blackett Street Bridge

Main girders, Hopper side, for Blackett Street Bridge

Wind bracing for Blackett Street Bridge

Girdir MG18 for 2 and 3 houses

Spur gears for anti-breaker

Purlins for anti-breaker

Bracing for frames F2-4

Handrails for drive house

Stairway to door, 1st Bay of Gantry from Blackett Street

Template for concrete depth

Floor giridrs and roof trusses for Blackett Street

Side framing angles for 2 and 3 houses

Girdir MG17 for 2 and 3 houses

Limit switchgear for Hebburn Staithes

Canopy N. Side frame for No. 1 Junction House

Canopy N. Side of top platform for No. 1 Junction House

Bracing alterations, West frame.

Outrigger on South Trestle, Blackett Street Bridge

Trestles T1, T2

Trestles for angle conveyor

Trestles T6

Trestles T5

Trestles T29

Roof bracing between No. 1 and No.2 houses

Bracing for trestles T19 and T20

Alteration to Trestles T2

Wind bracing between T30 and Junction house No. 1

Trestles T30

Roof bracing

Trestles T14

Girdirs between T30 trestle and No. 1 Junction House

Side frames for drive house for Nos. 1,2,3 conveyors

Trestle T3

Main girders between 1 and 2 Houses

Gable end for Drive House

Main girders MG7 to MG10, Electrical House to No.1 Junction House

 

Plans (approx. A0) of the Coal Shipping Plant (Staithes) at Jarrow, and Bates Colliery Staithes.
Location: Strongroom Centre tables

Jarrow 1935:
Cross section of 4-bay Gallery
Floor girders and centre columns for sloping gallery
Wind Bracing for 4-Bay gallery (two drawings)
Details of Gantry; Frames F2-F4
Installation drawing for Coal and Coke Hoppers

Jarrow, 185
Guard for No.8 Jigger Flywheel

 

Bates Colliery Coal Loading Plant
Modifications for 10’ extenstion to boom, 1985
Proposed modifications to coal loading plant, 1984
Conveyor head drum, 1971
Conveyor head drum for main boom, 1980
Conveyor head drum for new drives, 1985
Access ladders for new platform, 1982